A new built-up closed-rib section is proposed that may improve the installation, performance, and durability of orthotropic steel bridge decks. The rib is composed of two partial or whole standard hot-rolled steel sections which are connected by a steel plate. The concept is used to design a built-up closed-rib replacement for the Benjamin Franklin Bridge deck. In addition, section performance was compared with the actual bulb section as well as a typical trapezoidal section through finite element simulations. The analyses indicate that the built-up section has smaller stress concentration values as compared with the other sections, and hence, improved fatigue resistance is expected. Finally, it is concluded that the built-up rib has potential to be considered in future orthotropic steel deck designs.
CECA on X: We're proud to have reached our 25th year representing
CivilEng Free Full-Text Greening Roadway Infrastructure With Vetiver Grass To Support Transportation Resilience
Civil Engineer Svg, Engineering Svg, Civil (2754521)
400+ Civil Engineering Online Courses for 2024
Optimize working time calculations with our free Excel Timesheet
Software for Construction and Civil Engineering Firms
PDF] Objective Type and Conventional Questions and Answers On
Legit civil engineering: COMPLETE IES MASTER STUDY MATERIAL FREE PDF
PDF) Life-Cycle Assessment of Fly Ash and Cenosphere-Based Geopolymer Material
STRUCTURE MECHANIC 🌐Civil Engg Free Tutorials👇 🌐Linktr.ee
PDF) Perception of Civil Engineering Students Towards the
CivilEng, Free Full-Text
Revit OpEd: Importing CAD Files and Invert Colors, inverted colors
Current Advances in Civil Engineering - Kindcongress
Civil Engineering Journal